Tunnel and Shaft Wall Stabilization in Metro Construction Site with the Tiger MOBIL DRILL

Client Profile:
Infrastructure construction company responsible for the metro line construction in Bulgaria.

Objective:
To ensure the timely completion of the project and the safe operation of the metro line by stabilizing the shaft tunnel walls and implementing advanced protection systems for the other inclined surfaces within the project.

Operational Challenge

Key Obstacles:

  • Speed and Efficiency: As large tunnel boring machines shaped the metro line, fast and effective solutions were required to maintain project continuity.
  • Limitations of Traditional Stabilization Methods: Conventional stabilization techniques offered limited efficiency in narrow and hard-to-access areas, leading to extended working times.
  • Equipment Positioning Issues: Positioning and safely operating large drilling machines in confined spaces posed a significant challenge.

These challenges not only threatened worker safety but also created risks for the timely completion of the project.

SET MAKINA’s Solution

SET MAKINA recommended the Tiger MOBIL DRILL pneumatic drilling machine for the project.

  • Safe Operation: Pneumatic drilling enables safer operation in steep and hazardous conditions compared to hydraulic machines, significantly improving worker safety.
  • High Precision: Its robust mechanical structure allows for fast and highly precise drilling. Maintenance and spare-parts costs are lower compared to hydraulic systems.
  • Mobile Design: Easy to position in enclosed and hard-to-reach areas, ensuring efficient and uninterrupted operation.

➕ Next Steps

Need reliable equipment for slope stabilization or tunneling? Our Construction and infrastructure drilling machines are essential for these tasks. Talk to our experts.
Request a Technical Evaluation →

Note: Client name and site identifiers have been modified for confidentiality. All performance observations reflect actual field usage and direct operator feedback.

Case Studies

Tunnel and Shaft Wall Stabilization in Metro Construction Site with the Tiger MOBIL DRILL

Infrastructure construction company responsible for the metro line construction in Bulgaria.

Safer and More Durable Solutions on Steep Slopes

The historic Sumela Monastery in Trabzon is a major cultural heritage site, widely known for its unique architecture and high visitor numbers.

Related Products

Pneumatic Drilling Machine
​Hydraulic Drilling Machine
Pneumatic Breaker Hammer
Air-Leg Vertical Rock Drill
Hand Held Rock Drill
Hand Held Rock Drill
Mobile Pneumatic Drilling Unit
Pneumatic Drilling Unit
​Pneumatic Drilling Machine
Crawler Drilling Machine
Crawler Drilling Machine
Hydro-Pneumatic Drilling Column

Our Latest News & Articles

Stay up to date with insights, product launches, case studies, and trade-show highlights that help quarry and mine operators work safer, faster, and more profitably.

Unlock superior performance for your Machinery Need

Contact Us