Client Profile:
The historic Sumela Monastery in Trabzon is a major cultural heritage site, widely known for its unique architecture and high visitor numbers.
Objective:
To enhance visitor safety and ensure the long-term preservation of the monastery by implementing slope stabilization measures and advanced rockfall protection systems.
The client was facing:
These challenges posed a direct threat to both visitor safety and the structural integrity of the site.
SET MAKINA suggested the Tiger SMARTROOF-MOBILE pneumatic drilling machine for the project. This choice illustrates the importance of using construction and infrastructure drilling machines to overcome complex challenges. Key benefits included:

SET MAKINA’s team didn’t just sell us a machine—they helped us solve an engineering challenge.”
— Procurement Manager, Infrastructure Firm
Need reliable equipment for slope stabilization or tunneling? Construction and infrastructure drilling machines are essential for these tasks. Talk to our experts.
Request a Technical Evaluation →
Note: Client name and site identifiers have been modified for confidentiality. All performance observations reflect actual field usage and direct operator feedback
WhatsApp us